Taaleri Energia makes sustainable investments in utility-scale development and construction projects in onshore wind, solar and battery storage plants. 

Our energy team is one of the most competent in Europe. We have expertise in all phases of the project: project development, creation of investment opportunities, technical due diligence, execution of transactions, construction and operation.

In addition to being one of the most significant players in the Finnish wind power market with a capital background, we manage wind, solar and battery storage sites in our portfolio in Europe, the United States and the Middle East.

SolarWind III

The Taaleri SolarWind III Fund owns c. 60 early-, mid-, and late-stage wind, solar and battery storage development projects representing c. 8 GW of generation capacity in the Fund’s target markets – Nordics & Baltics, Poland & Southeast Europe, Spain, and Texas.  

If all of the development seed portfolio projects were to reach ready-to-build status during the Fund’s investment period, they would represent c. 8 GW of installed electricity generating capacity and require approximately EUR 2.5 billion in equity from the Fund to construct. Based on the development portfolio, the Fund expect to invest c. 50% in the Nordics & Baltics, c. 25% in Poland & Southeast Europe, c. 15% in Spain and c. 10% in Texas. 

By entering into wind, solar and battery storage projects at an earlier stage the Taaleri Energia development team can control all of the critical elements in the development phase. As a result, the Fund secures better quality projects and is able to deploy money quickly, leading to higher returns. 

The project Paistinkulma is Taaleri Energia’s first battery energy storage system investment. Project is located in Lempäälä, some 25 kms south of Tampere in Finland. With a 30 MW / 36 MWh capacity, the facility will be one of the largest battery energy storage systems operating in the Finnish frequency reserve market. The battery energy storage facility will support the balancing of the difference between production and consumption in the power grid by participating in Fingrid's reserve market. In addition, energy storage facilities enable further increase the share of renewable energy in the electricity grid. The capacity of the project has the potential to be doubled in the future.

The project Paistinkulma is one of the Taaleri SolarWind III fund sustainable investments, meaning that the project is EU Taxonomy EU/2020/852 aligned, sustainability is measured and monitored via sustainable indicators and the principle adverse impacts are considered and reported as a fund level. Sustainability indicators relating to the Paistinkulma project measure times renewable energy is transferred into high-demand hours and hours of electricity grid balancing is supplied.



30 MW /36 MWh battery energy storage



Enabling further increase the share of renewable energy in the electricity grid

 



Supporting the balancing of production and consumption



Estimated completion Q2/2024


 

 

 

Press release

SolarWind II

 

The Taaleri SolarWind II fund invested, together with Encro, in a wind farm in Croatia with a capacity of 111 MW. 

With a total of 25 Nordex wind turbines, the wind farm will have an installed capacity of 111 MW. The annual production of electricity supplied to the Croation grid will be approximately 373 GWh, while the wind farm will produce enough electricity to supply around 93,000 households and will enable emission reductions approximately 92,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

111 MW installed capacity

 

Emission reductions approx. 92,000 tCO2e

 

25 wind turbines

 

Providing electricity for around 93,000 households

 

Estimated production 373 GWh per year

 

Completed Q1/2024

 

Press release

Project web page

The Taaleri SolarWind II fund has, together with Atsinaujinančios Energetikos Investicijos, invested in a wind farm in Lithuania with a capacity of 50 MW.

Anykščiai is a operational phase wind farm, located in the county of Utena, Lithuania. The wind farm consists of 9 wind turbines, and the annual production of electricity is estimated at 152 GWh, providing electricity for around 65,000 households and will enable emission reductions approximately 26,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

50 MW installed capacity

 

Emission reductions approx. 26,000 tCO2e

 

9 wind turbines

 

Providing electricity for around 65,000 households

 

Estimated production 152 GWh per year

 

Completed Q1/2024

 

Press release

Project web page

The Taaleri SolarWind II fund has, together with Atsinaujinančios Energetikos Investicijos, invested in a wind farm in Lithuania with a capacity of 70 MW.

Jonava is a construction phase wind farm, located in the county of Kaunas in Lithuania. It consists of 13 wind turbines and has an estimated annual electricity production of 240 GWh. The wind farm will provide electricity for around 103,000 households and will enable emission reductions approximately 41,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

70 MW installed capacity

 

Emission reductions approx. 41,000 tCO2e

 

13 wind turbines

 

Providing electricity for around 103,000 households

 

Estimated production 240 GWh per year

 

Estimated completion Q2/2024

 

Press release

Project web page

The Taaleri SolarWind II fund has, together with Atsinaujinančios Energetikos Investicijos, invested in a wind farm in Lithuania with a capacity of 66 MW.

Rokiškis is a construction phase wind farm, located in the county of Utena, Lithuania. The wind farm consists of 12 wind turbines and has an estimated annual electricity production of 168 GWh. The wind farm will provide electricity for approximately 73,000 households and will enable emission reductions approximately 29,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

66 MW installed capacity

 

Emission reductions approx. 29,000 tCO2e

 

12 wind turbines

 

Providing electricity for around 73,000 households

 

Estimated production 168 GWh per year

 

Estimated completion Q2/2024

 

Press release

Project web page

The Taaleri SolarWind II fund has invested in a solar photovoltaic power plant in Southern Spain with a capacity of 50 MW.

Niebla is a solar plant, located in San Juan del Puerto in Andalusia, Spain. The solar plant has an estimated annual electricity production of 106 GWh. It will provide electricity for approximately 27,000 households will enable emission reductions approximately 35,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

50 MW installed capacity

 

Emission reductions approx. 35,000 tCO2e

 

92,500 solar panels

 

Providing electricity for around 27,000 households

 

Production 106 GWh per year

 

Completed Q4/2023

 

Press release

Project web page

The Taaleri SolarWind II fund invested in a wind farm in northern Finland with a capacity of 126 MW. 

Murtotuuli is a wind farm, located in Posio, Finland. The wind farm consists of 21 Vestas turbines and has an estimated annual electricity production of 335 GWh. The wind farm will provide electricity for approximately 22,000 households and will enable emission reductions approximately 70,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

126 MW installed capacity

 

Emission reductions approx. 70,000 tCO2e

 

21 wind turbines

 

Providing electricity for around 22,000 households

 

Production 335 GWh per year

 

Completed Q2/2023

 

Press release

Project web page

The Taaleri SolarWind II fund invested in a wind farm in north-western Finland with a capacity of 126 MW. 

Isoneva is a wind farm, located in Siikajoki, Finland. The wind farm consists of 21 Vestas turbines and has an estimated annual electricity production of 321 GWh. The wind farm will provide electricity for approximately 21,000 households and will enable emission reductions approximately 67,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

126 MW installed capacity

 

Emission reductions approx. 67,000 tCO2e

 

21 wind turbines

 

Providing electricity for around 21,000 households

 

Production 321 GWh per year

 

Completed Q1/2023

 

Press release

Project web page

The Taaleri SolarWind II fund invested, together with Masdar, in two wind farms in Northern Poland.

Mlawa and Grajewo are two wind farms located in Mazowieckie and Podlaskie, Poland. With a total of 24 Vestas wind turbines, the wind farms have a combined installed capacity of 51.4 MW. The annual production of electricity is approximately 190 GWh, while the wind farm produces enough electricity to supply around 86,000 households and will enable emission reductions approximately 136,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

51 MW installed capacity

 

Emission reductions approx. 136,000 tCO2e

 

24 wind turbines

 

Providing electricity for around 86,000 households

 

Production 190 GWh per year

 

Completed Q4/2021

 

Press release

Project web page for Mlawa

Project web page for Grajewo

The Taaleri SolarWind II fund invested, together with AIP, Ilmarinen and Akuo Energy, in a wind farm in North America with a capacity of 336 MW. 

Escalade is a wind farm, located in Texas, America. The wind farm consists of 65 Vestas turbines and has an estimated annual electricity production of 1,260 GWh. The wind farm will provide electricity for approximately 115,000 households and will enable emission reductions approximately 445,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

336 MW installed capacity

 

Emission reductions approx. 445,000 tCO2e

 

65 wind turbines

 

Providing electricity for around 115,000 households

 

Production 1,260 GWh per year

 

Completed Q2/2022

 

Press release

The Taaleri SolarWind II fund invested in a wind farm in western Norway with a capacity of 34 MW. 

Haram is a wind farm, located in Ålesund, Norway. The wind farm consists of 8 Vestas turbines and has an estimated annual electricity production of 110 GWh. The wind farm will provide electricity for approximately 7,000 households and will enable emission reductions approximately 4,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

34 MW installed capacity

 

Emission reductions approx. 4,000 tCO2e

 

8 wind turbines

 

Providing electricity for around 7,000 households

 

Production 110 GWh per year

 

Completed Q4/2021

 

Press release

Project web page

The Taaleri SolarWind II fund invested, together with fund co-investors, in a wind farm in north-western Finland with a capacity of 91 MW. 

Oltava is a wind farm, located in Pyhäjoki, Finland. The wind farm consists of 19 Nordex turbines and has an estimated annual electricity production of 285 GWh. The wind farm will provide electricity for approximately 19,000 households and will enable emission reductions approximately 59,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

91 MW installed capacity

 

Emission reductions approx. 59,000 tCO2e

 

19 wind turbines

 

Providing electricity for around 19,000 households

 

Production 290 GWh per year

 

Completed Q2/2021

 

Press release

Project web page

SolarWind I

 

The Taaleri SolarWind I fund invested in a wind farm in Sweden with a capacity of 14.4 MW. 

Målajord is located in the municipality of Växjö in Southern Sweden. The wind farm consists of three Nordex turbines and produces approximately 49 GWh of electricity per year. The wind farm provides electricity for approximately 5,000 households and enables emission reductions approximately 3,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

14 MW installed capacity

 

Emission reductions approx. 3,000 tCO2e

 

3 wind turbines

 

Providing electricity for around 5,000 households

 

Production 50 GWh per year

 

Completed Q3/2021

 

Press release

Project web page

The Taaleri SolarWind I fund invested in a wind farm in Southern Sweden with a capacity of 23.4 MW. 

Slageryd is an operational wind farm, located in Vetlanda municipality, Southern Sweden.The wind farm consists of six Nordex turbines and produces approximately 71 GWh of electricity per year and enables emission reductions approximately 3,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

23 MW installed capacity

 

Emission reductions approx. 3,000 tCO2e

 

6 wind turbines

 

Providing electricity for around 113,000 households

 

Production 71 GWh per year

 

Completed Q3/2020

 

Press release

Project web page

The Taaleri SolarWind I fund has, together with Masdar, invested in a wind farm in Serbia with a capacity of 158 megawatts.

Cibuk I is a wind farm, located in Serbia. The wind farm consists of 57 GE turbines and has an annual electricity production of 409 GW. It provides electricity for approximately 76,000 households and enables emission reductions approximately 381,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

158 MW installed capacity

 

Emission reductions approx. 381,000 tCO2e

 

57 wind turbines

 

Providing electricity for around 76,000 households

 

Production 409 GWh per year

 

Completed Q3/2019

 

Press release

Project web page

The Taaleri SolarWind I fund has, together with Masdar, invested in a solar photovoltaic power plant in in the Middle East with a capacity of 200 MW.

Baynouna is a solar plant, located in Jordan. The solar plant consists of 740,000 solar panels and has an estimated annual electricity production of 590 GWh. It provides electricity for approximately 151,000 households and enables emission reductions approximately 280,000 tonnes of carbon dioxide equivalent (tCO2e) during each year of operation.

 

 

 

200 MW installed capacity

 

Emission reductions approx. 280,000 tCO2e

 

740,000 solar panels

 

Providing electricity for around 151,000 households

 

Production 590 GWh per year

 

Completed Q4/2020

 

Press release

Project web page

Wind fund II and III

 

Kooninakallio wind farm is located c. 100 km North of Tampere and it consists of 9 wind turbines in total.

Kooninkallio has been operational since September 2016.

The wind farm is 100% owned by Wind II fund.


27 MW installed capacity


Emission reductions approx. 19,000 tCO2e


9 wind turbines


Providing electricity for around 6,000 households


Production 92 GWh


Completed Q3/2016

 

Press release 19.3.2015 (in Finnish)

Kantti wind farm is located c. 100 km Northwest of Tampere and it consists of 8 wind turbines in total.

The construction work started in the summer of 2016 and the park was fully operational by the end of 2016.

The Wind II fund has 100 % ownership.


24 MW installed capacity


Emission reductions approx. 17,000 tCO2e


8 wind turbines


Providing electricity for around 6,000 households


Production 82 GWh


Completed Q4/2016

 

Press release 19.11.2015 (in Finnish)

Pajukoski wind farm is located in Central Ostrobothnia, Western part of Finland

Construction work of Pajukoski wind farm started in Q4/2014 and was completed in October 2015

Total capacity of wind farm is 29,7 MW and wind farm consist of total 9 turbines.The wind farm is 100 % owned by Taaleri Wind II fund.


30 MW installed capacity


Emission reductions approx. 19,000 tCO2e


9 wind turbines


Providing electricity for around 6,000 households


Production 91 GWh


Completed Q4/2015

 

Press release 25.8.2014 (in Finnish)

Kytölä wind farm is located in Northwest part of Finland in Alavieska, 15 km from the sea.

Construction work of Kytölä wind farm started in 2014 and was completed in December 2015.

Total capacity of wind farm is 19,8 MW and consists of 6 turbines.

The wind farm is 100 % owned by Taaleri Wind II fund.


20 MW installed capacity


Emission reductions approx. 13,000 tCO2e


6 wind turbines


Providing electricity for around 4,000 households


Production 61 GWh


Completed Q4/2015

Limakko wind farm is located in Central Ostrobothnia, Western part of Finland.

The construction work started in the summer of 2016 and the park was fully operational by the end of 2016.

The Wind II fund has 100 % ownership


27 MW installed capacity


Emission reductions approx. 19,000 tCO2e


9 wind turbines


Providing electricity for around 6,000 households


Production 91 GWh


Completed Q4/2016

Kivivaara-Peuravaara wind farm is located 160 km east of Oulu and consists of 30 wind turbines in total.

Kivivaara-Peuravaara was aquired in 2015 from Metsähallitus, a forestry company owned by the Finnish government. The projcect was constructed in three phases during 2016 and 2017 and the wind farm was fully operational by the end of 2017.

The Kivivaara-Peuravaara wind farm is 80% owned by the Taaleri Tuulitehdas II and Taaleri Tuulitehdas III funds and 20% owned by Loiste Energia Oy, a Finnish energy company.

 


90 MW installed capacity


Emission reductions approx. 40,000 tCO2e


30 wind turbines


Providing electricity for around 13,000 households


Production 193 GWh


Completed Q4/2017

 

Press release 26.9.2014 (Finnish)

Press release 9.3.2016 (Finnish)

Press release 27.6.2016 (Finnish)